How Do I Change the Work Bundle/Job of a Timecard?

Change the Work Bundle/ of a single timecard

Option 1
  1. Navigate to Timecards
  2. Select an employee's timecard and click edit on the top of the screen
  3. In the "Edit Timecard" window, select the Work Bundle/Job field
  4. Choose the new Work Bundle/Job from the drop-down
  5. Select Save
Option 2
  1. Navigate to Timecards
  2. Select an employee's timecard
  3. Right-click on it
  4. Click edit Edit
  5. In the "Edit Timecard" window, select the Work Bundle/Job field
  6. Choose the new work Bundle/Job from the drop-down
  7. Select Save

Change the site/location of multiple timecards

  1. Navigate to Timecards
  2. Select multiple timecards for different employees
  3. Right-click on them
  4. Click edit Edit
  5. In the "Edit Checkpoints" window, select the "set Job" checkbox
  6. Select the site/location field 
  7. Choose the new site/location from the drop-down
  8. Select Save

The jobs available on the drop-down will depend on the work bundle selected. If the job you want to select is not on the drop-down probably you will need to change the work bundle as well.

The Timecards section has two pages: Timeline and List. The process described above can be done on either page.

Other related topics

Calificar artículo Calificacion de éxito del artículo Falla en calificación del artículo

Todavia necesita ayuda? Contactanos Contactanos